New Build Handover Snagging & Inspection
Duration
Agreed by scope
Investment
Custom quote
Overview
Professional Property Assessment
Before a new-property handover, an independent inspection can document conditions visible and accessible during the agreed visit. Findings are recorded with context for your own discussion with the developer; contractual responsibilities and any rectification decisions depend on the documents and circumstances that apply.

Key Features
Visual review of accessible structural elements; not a stability certification
MEP systems inspection (mechanical, electrical, plumbing)
Finishing quality evaluation and compliance verification
Door and window functionality testing
Flooring, tiling, and paintwork inspection
Kitchen and bathroom fittings examination
Balcony and terrace safety assessment
Common area and external facade review
Strategic Benefits
Protect your investment from hidden defects
Record visible observations for your own review
Identify visible conditions for your own follow-up
Inspection documentation for your own follow-up
Peace of mind before taking possession
Findings may inform your own discussions; no outcome is promised
Methodology
Our Technical Process
Pre-inspection consultation and scheduling
Comprehensive on-site examination (4-8 hours)
Digital documentation with photos and videos
Detailed snagging report generation
Client presentation and explanation
Reinspection only by agreed separate scope; not guaranteed
Before handover
Prepare for a new-build inspection
Arrange access before your handover appointment where possible, so observations can be recorded while the property is available and before your own walkthrough.
A useful checklist
- Confirm access, parking and any building registration requirements.
- Share available floor plans, handover notes and the developer’s snagging checklist.
- Ensure utilities are on where safe and permitted; provide access to rooms, balconies and service points.
The inspection records visible, accessible conditions using non-destructive methods. Concealed construction and inaccessible systems are outside a visual inspection. Findings can support a discussion with the developer but do not guarantee acceptance, rectification or a particular handover outcome.
Inquiry & FAQ
Frequently Asked Questions
What is new build handover snagging?
New build snagging records accessible, visible defects in finishes, MEP systems and safety items before handover. The photographic report helps you raise items with the developer; repair responsibility and timescales depend on your agreement.
When should I book a snagging inspection?
Book the inspection before your handover walkthrough. This gives you an independent defect list to present to the developer, rather than relying on their own quality control team.
What may be found during a new-build inspection?
Observations vary by property and access. Findings can include visible finish issues, incomplete work, leaks or system concerns; the agreed report records what could be observed on the day.
Engagement
Discuss Your New Build Handover Snagging & Inspection
"Tell us about the property and the outcome you need. We will confirm availability, scope and a custom quote before proceeding."